The territory of the former expanded clay plant
Mulyarovka village, 9
Lease
10053.6
JSC Gomel House-building Plant
1966
General characteristics
Complex of objects
Land plot area (ha)13.6
Coverage of the land plotground
Purpose of useIndustry
Number of storeys1
Walls materialbrick
Dividing wallsYes
Interior finishNo
Ventilation systemYes
LightingYes
Sanitary zones or other restrictionsRoadside lane of the highway
Download document 1Infrastructure
Main republican roads, Railway, Own railway branch
Transport infrastructure description Access roads - asphalted road.
Distance to the nearest road of national importance - 1,7 km (M-10 border of the Russian Federation-Gomel-Kobrin).
Distance to the railway station Mulyarovka - 3 km, there is a railroad track
Distance to the district center of Petrikov - 10 km
1.7 (distance from the object, km)
Engineering infrastructureElectricity, Heating system, Drinking water, Sewerage, Gas supply
Engineering infrastructure description Source of power supply: TA 1000 kW; TA 1000 kW (in the building of the furnace shop). Transformer substation and feeding VL-10kV N 726 from substation 35 Mulyarovka.
Water supply: 2 artesian wells (1 of them needs repair, is not used), water tower
Water removal: there is a water pumping station and filtration fields
Gas supply: there is a gas distribution point, the load can be provided to 3000 cubic meters / hour.