Boiler room building with equipment
Minsk Region, Minsk District, Khatezhinsky Village Council, 34, Staroye Selo Village
Sale, Other
595.5
Municipal subsidiary production unitary enterprise Minrayteploset
141489
1979
General characteristics
Separate object
Land plot area (ha)0.3761
Coverage of the land plotlawn
Purpose of useplacement of administrative, household, municipal, warehouse, and industrial facilities
Other purpose of useplacement of administrative, household, municipal, warehouse, and industrial facilities
Number of storeys2
Walls materialBricks, reinforced concrete panels
Dividing wallsYes
Interior finishYes
Ventilation systemNo
LightingNo
Sanitary zones or other restrictionsSecurity zone of electrical networks with a voltage of up to 1000 volts, code 5.2, area 0.0180 hectares; security zone of electrical networks with a voltage of more than 1000 volts, code 5.2, area 0.0525 hectares; land plots located in the security zones of heating networks and facilities, code 5.6, area 0.3761 hectares.
Other significant facilitiesThe New Lebyazhye wholesale market (d. Tabory) is the largest trading platform in the region, specializing in wholesale and retail trade in food and non-food products. • Logistics centers - modern warehouse complexes, such as the Modern Logistics Center 24, are actively developing in the district. • Industrial enterprises - companies such as: BelPSP LLC, Sovartus LLC, Additional Liability Company EVA TRADE
Infrastructure
Highway, Main republican roads, Airport
HighwayMinsk Ring Road-2
6.7 (distance from the object, km)
Main republican roadsR-65
0.62 (distance from the object, km)
AirportMinsk National Airport
65 (distance from the property, km)
Engineering infrastructureElectricity
Engineering infrastructure descriptionThe electrical panel is located in the building, drinking and technical water is disconnected, local sewage is disconnected, and gas supply is disconnected
Electricity supply45 kW



