• Administrative and utility building
Actual use
Other
Region
Brest Region
District
Baranovichy
Location GPS
53.107687, 25.949301
Ownership
Private
Owner's name
LTD ACTIVE SHOES
Purpose of use
Industry, Services (incl. trade, tourism, hotels, etc.), Transport & Logistics, IT-sphere and communication facilities, Other
Total floor area (sq.m)
6809.6
Means of use
Lease, Sale
Property cost (USD) as of January 1, current year
2383360
Year of construction
1998
Year of renovation
2011
Number of storeys
8
Walls material
Panels with brick inserts
Dividing walls
Yes
Interior finish
Yes
Ventilation system
Yes
Lighting
Yes
Engineering infrastructure
Electricity, Heating system, Drinking water, Hot water supply, Sewerage, Gas supply
Engineering infrastructure description
possible to switch to 1000 KVA capacity Eight-story building with a total area of 6,809.6 m2, equipped with all communications: water supply, sewerage, electricity, heat and telephone. Building volume - 25 695 m3 ABC consists of three parts with different floors.
Transport connection
Highway, Access road
Transport infrastructure description
from the center of Baranovichi - 7 km, From the highway M1 (Moscow-Brest) 5 km
Address (street, building)
Baranovichi city, ul. Slonimskoe Shosse, 29
Sanitary zones or other restrictions
-
Type of facility
Separate object
Send Interested Export to Pdf Export to Word
  • Administrative and utility building
  • Sector Other
  • Form of ownership Private
  • Land plot area (ha) 2.11
  • Means of use Lease, Sale
  • Total floor area (sq.m) 6 809.60
  • Owner's name LTD ACTIVE SHOES
  • Purpose of use Industry, Services (incl. trade, tourism, hotels, etc.), Transport & Logistics, IT-sphere and communication facilities, Other
  • Sanitary zones or other restrictions -
  • Region Brest Region
  • District Baranovichy
  • Address Baranovichi city, ul. Slonimskoe Shosse, 29
  • GPS coordinates 53.107687, 25.949301
  • Year of construction 1998
  • Year of renovation 2011
  • Number of storeys
  • Walls material Panels with brick inserts
  • Dividing walls Yes
  • Interior finish Yes
  • Ventilation system Yes
  • Lighting Yes
  • Administrative and utility building
Distance from the object, kmDescription
Electricity
Heating
Drinking water
Industrial water
Hot water supply
Wells
Canalization
Gas supply
Distance from the object, kmDescription
Highway
Roads of national level
Airport
Railway
Access roads
  • Transport infrastructure description from the center of Baranovichi - 7 km, From the highway M1 (Moscow-Brest) 5 km
  • Engineering infrastructure description possible to switch to 1000 KVA capacity Eight-story building with a total area of 6,809.6 m2, equipped with all communications: water supply, sewerage, electricity, heat and telephone. Building volume - 25 695 m3 ABC consists of three parts with different floors.
  • Administrative and utility building
Investment projects and PPP
Investment ideas
Manufacturing sites and real estate
Concessions
Land Plots

STATISTICAL DATA FOR Baranovichy