Machinery and equipment (CJ+CK)
Building complex of the P.K.Ponomarenko Gomel Starting Engine Plant OJSC
Gomel Region, Gomel 52.42004,30.95615
Private Gomel, 150 Barykina str.
Means of use
Sale
Total floor area (sq.m)
3608.3
Owner's name
Gomel Plant of starting engines named after P.K.Ponomarenko JSC
Property cost (USD) as of January 1, current year
.
Year of construction
1984
General characteristics
Type of facility
Complex of objects
ComponentsOpen storage of OCS metal -3203,7 sq.m; Refuelling building of fuel and lubricants warehouse - 35,5 sq.m;
Land plot area (ha)0.8
Purpose of useIndustry, Other
Number of storeys1
Walls materialbrick
Dividing wallsNo
Interior finishYes
Ventilation systemYes
LightingYes
Sanitary zones or other restrictionsBasic size of the sanitary protection zone of the object to be located not more than 100m
Other significant facilitiesDistance from residential boundaries to the proposed environmental impact source 100 to 200 metres
Download document 1Infrastructure
Transport connection
Access road
Transport infrastructure descriptionAsphalted driveway. The properties are located close to main streets and have a separate entrance
Engineering infrastructureElectricity
Engineering infrastructure descriptionThere is no sewerage, heating and water supply (before connecting to the networks 100 m). There is no gas.
infrastructurelayers
Business Environment
Business Incubators
Free Economic Zones
Preferential Treatment
Towns and Cities
Technoparks
Business Support Centers
Associations and Unions
Clusters
Education
Universities
Colleges
Transport and Logistics
Airports
Logistic hubs
River ports
Railways
Car roads
Power grids
110 kW
220 kW
330 kW