Industrial complex and warehouse buildings
Lease
552.6
Notoz-invest, LLC
669770.43
2019
General characteristics
3.68
Purpose of useIndustry, Agriculture (incl. processing), Green economy (renewable energy, waste recycling)
Number of storeys1
Walls materialsandwich panel
Dividing wallsYes
Interior finishYes
Ventilation systemYes
LightingYes
Download document 1Download document 2
Download document 3
Download document 4
Download document 5
Download document 6
Download document 7
Download document 8
Download document 9
Infrastructure
Highway, Main republican roads, Railway, Access road
Transport infrastructure description The facility is located 4 km from the city of Mogilev at the intersection of automobile transit transport routes:
- M8 (E95) highway “The border of the Russian Federation (Ezerische) - Vitebsk - Gomel - the border of Ukraine (Novaya Guta)”
- the road of republican significance P122 "Mogilev - Cherikov - Kostyukovichi".
- M4 highway Minsk-Mogilev - 40 km from the facility.
Railway Mogilev - Krichev
Electricity, Drinking water, Industrial water, Wells, Sewerage
Engineering infrastructure description Two own wind power plants with a total capacity of 4 MW with a production volume of 7.5 millionkWh / year. Uninterrupted power supply and additional power supply to the site is provided by a three-way power supply scheme from the combined power system with a permitted capacity of 5 MW.
Electrical heating
Well capacity-6 m cubic / h