Investment site №4
Korotoki agro-towni, Molodezhny lane
General characteristics
Lease
Total area, ha0.4
Potential ways of usageIndustry, Services (incl. trade, tourism, hotels, etc.), Transport & Logistics, IT-sphere and communication facilities, Agriculture (incl. processing), Green economy (renewable energy, waste recycling), Roadside service, filling stations, Other
Sanitary zones or other restrictionsa communication cable runs along the land plot, the distance from the boundaries of residential development is 50m.
Cadastral value of 1 ha, $4500
Land encumbranceno encumbrances
Download document 1Infrastructure
Highway, Main republican roads, Airport, Railway, Access road
HighwayМ8
30 (distance from the object, km)
Main republican roadsР30
4 (distance from the object, km)
AirportGomel Airport
95 (distance from the object, km)
RailwayRogachev station
60 (distance from the property, km)
Access roads0.01 (destination from the object, km)
Engineering communicationsElectricity, Drinking water, Sewerage, Gas supply
Engineering infrastructure descriptionComplete transformer substation-240 Korotki with a capacity of 250 kVA, Possible connection capacity 230 kW
Electricity supply250 kW
0.2 (distance from the object, km)
Drinking water0.02 (distance from the object, km)
Sewerage0.05 (distance from the object, km)
Gas supplyUp to 0.3 MPa, up to 1000 m³/h
0.03 (distance from the object, km)