Investment site №4
Korotoki agro-towni, Molodezhny lane
General characteristics
0.4
Cadastral value of 1 ha, $4500
Ways of land provisionLease
Land encumbranceno encumbrances
Potential ways of usageIndustry, Services (incl. trade, tourism, hotels, etc.), Transport & Logistics, IT-sphere and communication facilities, Agriculture (incl. processing), Green economy (renewable energy, waste recycling), Roadside service, filling stations, Other
Sanitary zones or other restrictionsa communication cable runs along the land plot, the distance from the boundaries of residential development is 50m.
Download document 1Infrastructure
Highway, Main republican roads, Airport, Railway, Access road
Transport infrastructureEngineering communications
Electricity, Drinking water, Sewerage, Gas supply
Description of engineering communicationsComplete transformer substation-240 Korotki with a capacity of 250 kVA, Possible connection capacity 230 kW
Electricity supply250 kW
0.2 (distance from the object, km)
Drinking water0.02 (distance from the object, km)
Sewerage0.05 Drainage (distance from the object, km)
Gas supplyUp to 0.3 MPa, up to 1000 m³/h
0.03 (distance from the object, km)
HighwayМ8
30 Motorway access (distance from the object, km)
Main republican roadsР30
4 Roads of national level (distance from the object, km)
AirportGomel Airport
95 (distance from the object, km)
RailwayRogachev station
60 Railways (distance from the object, km)
Access roads0.01 (destination from the object, km)