• Roadside service facility construction
Region
Gomel Region
District
Buda-Koshelevo District
Address
Gubichy Village Council, Nedoyka village, Sovetskaya str.
Location
52.66093,30.40775
Total area, ha
2.5
Cadastral value of 1 ha, $
0
Form of ownership
State
Potential ways of usage
Roadside service, filling stations
Ways of land provision
Lease
Land incumbrance
Distance from the boundaries of residential development - 45 meters from the north-western land. - The land plot is located on reclaimed (reclaimed) lands
Transport connection
Highway, Railway
Motorway access (distance from the object, km)
2
Railways (distance from the object, km)
12
Transport infrastructure
to the highway M-5 / E271 Minsk-Gomel - 2 km; to the railway station Buda-Koshelevo - 12 km.
Description of engineering communications
High pressure gas pipeline 0.4 MPa at a distance of 12 km. The amount of electric power to the existing electric networks (lines) without their reconstruction is 8 kW. The value of the possible electric power of connecting the investment object from the SS-35 kV "Boets", taking into account all investment sites and unused real estate objects, is 3000 kW. Possibility of connecting water and sewerag
Locality
д. Недойка, ул. Советская
Highway (name)
M-5/E271 Minsk-Gomel
Railway (name)
Buda-Koshelevo station
Декрет № 10
Yes
Sanitary zones or other restrictions
It is allowed to place objects with the creation of sanitary gaps specified in paragraph 15 of the specific sanitary and epidemiological requirements for the establishment of sanitary protection zones of objects that are objects of impact on human health and the environment, approved by the Resolution of the Council of Ministers of the Republic of Belarus dated 11.12.2019. No. 847. It is not allowed to place production facilities in the existing residential development due to non-compliance with the basic parameters of the sanitary protection zones of facilities in accordance with Appendix 1 of the above sanitary and epidemiological requirements.
Highway
M-5/E271 Minsk-Gomel
2 Motorway access (distance from the object, km)
Railway
Buda-Koshelevo station
12 Railways (distance from the object, km)
Send Interested Export to Pdf Export to Word
  • Roadside service facility construction
  • Sector Transport and Logistics (H)
  • Form of ownership State
  • Land plot area (ha) 2.50
  • Region Gomel Region
  • District Buda-Koshelevo District
  • Address Gubichy Village Council, Nedoyka village, Sovetskaya str.
  • GPS coordinates 52.66093,30.40775
  • Locality д. Недойка, ул. Советская
  • Ways of land provision Lease
  • Potential ways of usage Roadside service, filling stations
  • Sanitary zones or other restrictions It is allowed to place objects with the creation of sanitary gaps specified in paragraph 15 of the specific sanitary and epidemiological requirements for the establishment of sanitary protection zones of objects that are objects of impact on human health and the environment, approved by the Resolution of the Council of Ministers of the Republic of Belarus dated 11.12.2019. No. 847. It is not allowed to place production facilities in the existing residential development due to non-compliance with the basic parameters of the sanitary protection zones of facilities in accordance with Appendix 1 of the above sanitary and epidemiological requirements.
  • Land incumbrance Distance from the boundaries of residential development - 45 meters from the north-western land. - The land plot is located on reclaimed (reclaimed) lands
  • Roadside service facility construction
Distance from the object, kmDescription
Electricity
Heating
Drinking water
Industrial water
Hot water supply
Wells
Canalization
Gas supply
Distance from the object, kmDescription
Highway2M-5/E271 Minsk-Gomel
Roads of national level
Airport
Railway12Buda-Koshelevo station
Access roads
  • Transport infrastructure description to the highway M-5 / E271 Minsk-Gomel - 2 km; to the railway station Buda-Koshelevo - 12 km.
  • Engineering infrastructure description High pressure gas pipeline 0.4 MPa at a distance of 12 km. The amount of electric power to the existing electric networks (lines) without their reconstruction is 8 kW. The value of the possible electric power of connecting the investment object from the SS-35 kV "Boets", taking into account all investment sites and unused real estate objects, is 3000 kW. Possibility of connecting water and sewerag
  • Roadside service facility construction
Investment projects and PPP
Investment ideas
Manufacturing sites and real estate
Concessions
Land Plots

STATISTICAL DATA FOR Buda-Koshelevo District