For the construction of an industrial equipment manufacturing plant with an administrative building and a gas boiler house
Telminsky village council, airport district
General characteristics
121200000001003135
Ways of land provisionLease
Total area, ha3.25
Potential ways of usageIndustry
Cadastral value of 1 ha, $15406.94
Land encumbranceVertical layout; Fencing; Storm sewer; Household fecal sewerage; Outdoor water supply; Power supply; Boiler room 6,14 x 12,4, h = 3 m 350-525 kW (without equipment); Gas supply F=63 mm; TP 10,35x7,9, h = 3 m, 2x1000kw (without equipment); Heating line; Production building 66x18, h=9.55 m (foundations); Shop Paint 50x11,8, h = 7 m (k/b) (foundations); Assembly shop 60x33,6 h = 6.1 m (foundations); 2 checkpoint 4,1x3,45 h = 2.7 m; ABK 2 fl. 22,4x6,7 h=3m; Landscaping (1 layer of asphalt); Survey and design work.
Infrastructure
Highway, Main republican roads, Airport
Transport infrastructure descriptionThe land plot is located in the immediate vicinity of the airport. Also nearby is the M1 highway— the main transit road in Belarus, which is part of the European route E 30
Highway0.55 (distance from the object, km)
Main republican roads0.55 (distance from the object, km)
Airport2 (distance from the object, km)
Engineering communicationsElectricity, Heating system, Drinking water, Industrial water, Hot water supply, Sewerage, Gas supply
Engineering infrastructure descriptionOn the place there are utilities: electricity, heating (heating networks), drinking water, industrial water, hot water supply, sewerage, gas supply.