• Greenfield FEZ Mogilev 100 ha on Site 1
Region
Mogilev Region
District
Mogilev District
Location
53.97013,30.32298
Total area, ha
100
Cadastral value of 1 ha, $
15300
Form of ownership
State
Potential ways of usage
Industry, Services (incl. trade, tourism, hotels, etc.), Transport & Logistics
Ways of land provision
Lease
Land incumbrance
No
Transport connection
Highway, Main republican roads, Railway, Access road
Transport infrastructure
Access roads; railway along the land plot
Engineering communications
Electricity, Drinking water, Gas supply
Electricity supply (distance from the object, km)
0.2
Gas supply (distance from the object, km)
0
Description of engineering communications
A 110/10kW power substation with 27.97 MW spare capacity is located 200 m away from the lot. There is a power line running along the lot. 20 m-wide areas astride the power line constitute the sanitary protection zone. A gas line lies across the lot. A gas control point is located on the lot. A 150 mm water pipeline lies at the distance of 100m. A fire depot for 4 fire-fighting vehicles - 4000m.
Locality
Могилев
Electricity supply
0.2 (distance from the object, km)
Send Interested Export to Pdf Export to Word
  • Greenfield FEZ Mogilev 100 ha on Site 1
  • Sector Transport and Logistics (H)
  • Form of ownership State
  • Land plot area (ha) 100.00
  • Region Mogilev Region
  • District Mogilev District
  • GPS coordinates 53.97013,30.32298
  • Locality Могилев
  • Ways of land provision Lease
  • Potential ways of usage Industry, Services (incl. trade, tourism, hotels, etc.), Transport & Logistics
  • Cadastral value of 1 ha, $ 15300
  • Land incumbrance No
  • Greenfield FEZ Mogilev 100 ha on Site 1
Distance from the object, kmDescription
Electricity0.2
Heating
Drinking water
Industrial water
Hot water supply
Wells
Canalization
Gas supply0
Distance from the object, kmDescription
Highway
Roads of national level
Airport
Railway
Access roads
  • Transport infrastructure description Access roads; railway along the land plot
  • Engineering infrastructure description A 110/10kW power substation with 27.97 MW spare capacity is located 200 m away from the lot. There is a power line running along the lot. 20 m-wide areas astride the power line constitute the sanitary protection zone. A gas line lies across the lot. A gas control point is located on the lot. A 150 mm water pipeline lies at the distance of 100m. A fire depot for 4 fire-fighting vehicles - 4000m.
  • Greenfield FEZ Mogilev 100 ha on Site 1
Investment projects and PPP
Investment ideas
Manufacturing sites and real estate
Concessions
Land Plots

STATISTICAL DATA FOR Mogilev District