The territory of the former brick factory
Petrikov, Kommunalnaya str., 79
Lease
3896
Rudko Y.L., Stroyalex LLC, Pashkevich I. A., Novik A.V., Mironovich E.S., Yudenko N.A., Lapin A.A.
1964
General characteristics
Complex of objects
Land plot area (ha)8.8
Coverage of the land plotsoil, paved entrances
Purpose of useServices (incl. trade, tourism, hotels, etc.)
Number of storeys1
Walls materialbrick
Dividing wallsYes
Interior finishNo
Ventilation systemNo
LightingNo
Sanitary zones or other restrictionsPripyat River water protection zone
Download document 1Infrastructure
Main republican roads, Railway
Transport infrastructure description Access roads: paved road.
The distance to the nearest highway of republican significance is 13 km (M-10 border of the Russian Federation-Gomel-Kobrin)
Distance to the railway: railway station "Mulyarovka" – 13 km
13 (distance from the object, km)
Railway13 (distance from the property, km)
Engineering infrastructureElectricity, Drinking water
Engineering infrastructure description Power supply: - power reserve from the existing TP No. 31 (2x400 MVA) - up to 0.6 MW according to KL-10 kV No. 732 from PS-110 "Petrikov".
Reconstruction of the existing TP 10/0.4 is required kV at the facility or the construction of a new one. The existing TP is not on the balance of the RUP
Gomelenergo.
Water supply: central water supply network (drinking water)