• Administrative and production building
Actual use
Textile, Clothing and Footwear Production (CB)
Region
Minsk
Location GPS
53.925004, 27.563592
Ownership
Private
Owner's name
Open Joined-Stock Company Alesy
Purpose of use
Industry, Services (incl. trade, tourism, hotels, etc.), IT-sphere and communication facilities
Total floor area (sq.m)
4407
Means of use
Sale
Property cost (USD) as of January 1, current year
1307147.60
Year of construction
1978
Number of storeys
4
Walls material
brick
Dividing walls
Yes
Interior finish
Yes
Ventilation system
Yes
Lighting
Yes
Engineering infrastructure
Electricity, Heating system, Drinking water, Industrial water, Hot water supply, Sewerage
Engineering infrastructure description
on the territory there is a gas boiler room, a bomb shelter, a transformer substation.
Transport connection
Highway, Airport, Railway, Access road
Transport infrastructure description
Ground and underground urban transport
Address (street, building)
Minsk, Starovilenskaya st., 131
Send Interested Export to Pdf Export to Word
  • Administrative and production building
  • Sector Textile, Clothing and Footwear Production (CB)
  • Form of ownership Private
  • Land plot area (ha) 0.13
  • Means of use Sale
  • Total floor area (sq.m) 4 407.00
  • Owner's name Open Joined-Stock Company Alesy
  • Purpose of use Industry, Services (incl. trade, tourism, hotels, etc.), IT-sphere and communication facilities
  • Region Minsk
  • Address Minsk, Starovilenskaya st., 131
  • GPS coordinates 53.925004, 27.563592
  • Year of construction 1978
  • Number of storeys
  • Walls material brick
  • Dividing walls Yes
  • Interior finish Yes
  • Ventilation system Yes
  • Lighting Yes
  • Administrative and production building
Distance from the object, kmDescription
Electricity
Heating
Drinking water
Industrial water
Hot water supply
Wells
Canalization
Gas supply
Distance from the object, kmDescription
Highway
Roads of national level
Airport
Railway
Access roads
  • Transport infrastructure description Ground and underground urban transport
  • Engineering infrastructure description on the territory there is a gas boiler room, a bomb shelter, a transformer substation.
  • Administrative and production building
Investment projects and PPP
Investment ideas
Manufacturing sites and real estate
Concessions
Land Plots

STATISTICAL DATA FOR Minsk