550000
An investment of $250,000 will enable the establishment of a modern 8-hectare pigeon plantation. The project recovers in 5-6 years and generates $170,000 net profit annually for 25-30 years. The profitability of production is 215%, which is significantly higher than the average in agriculture.
Type of investment projectПредлагаемые для реализации инвестиционные проекты
Total volume of investments, thousand $250000
Expected input of an investor, thousand $250000
Project period2026-2046
Investor participation formсоздание нового производства (предприятия), с государственной поддержкой, Equity participation
Project descriptionWe are creating a high-margin agribusiness with 215% profitability. Section 8 ha with the category "agricultural knowledge" allows to lay 26,500 plants of blueberry - a variety with high price and demand. Investment: $250,000 (full project closure: planting, watering, refrigerator, machinery, starting salary). Financial results: Profit-making: 3rd year Full power: 4-5 years Peak harvest: 75 tonnes/year Revenue: $300,000/year Net profit: $170,000/year Payback: 5-6 years Life of plantation: 25-30 years An asset that will yield a stable return for decades. A transparent legal structure (SLT), long-term land leases, understandable risks. Ready for a detailed presentation and in-person meeting.
The nomenclature of the product to be produced with indication of the CN FEA codeThe project provides for the industrial cultivation of high-bore blueberry blueberries with high export potential and stable domestic demand. Main product: Fresh pigeon berries (product type, hand-picked) Packing: 0.5 kg / 1 kg plastic containers Implementation: fresh market, retail networks, processors, HoReCa Additional formats (from 4-5 years): Deep freeze - IQF yam for export and processing Processing berries - jams, jellies, juices (B2B) Peak performance: Number of bushes: 26,500 Planned yield: 2.5-3 kg per bush Gross levy: up to 75 tonnes per year Sales revenue: $300,000 per year Products meet quality standards and are suitable for export to the Russian Federation and EAEU countries. Processing and packaging is possible under the customer’s brand.
Annual revenues once fully operational (without VAT, thousand $)300000
Simple pay-back period, yrs5
Dymanic pay-back period, yrs6
NPV, thousand $550 000
IRR, %45
Discount Rate, %12
Potential customerPrivate consumers, manufacturing companies, and retailers
Key benefits of the projectKey project benefits 1. Superprofitability. IRR 42-45% - higher than most financial instruments and agricultural projects in RB. 2. Short payback. A simple term of 5-6 years, dynamic 6-7 years at NPV $550,000 (optimistic scenario). 3. Stable demand. A pigeon poplar crop with a growing market in the Russian Federation and Russia, supply shortfalls persist. 4. A long life cycle. The plantation produces fruit for 25-30 years without restarting. 5. A clear legal structure. Land of agricultural denominations, registration of the KHF with state support is possible. 6. Transparent financial model. Detailed calculation of costs, personnel, yields and break-even points.
Level of project developmentDegree of project development The project is in pre-investment stage, fully prepared for launch: 1. Feasibility Study (SEE) - developed, includes yield calculations (2.5-3 kg/bush), revenues ($300,000/year), net profit ($170,000/year), NPV ($430-550 thousand), IRR (32-45%), yielding (5-6 years). 2. Business plan - ready, development date: March 2026. Contains: Marketing analysis of the pigeon market in the RF and Russia Production plan (planting 26,500 bushes, irrigation system, refrigerator) Organizational plan (staffing table, KFS) Financial model and risk analysis 3. Pre-investment: Plot 8 ha selected and previously agreed (category: agricultural knowledge) Soil analysis performed (meets requirements) Identified sources of water for irrigation Grade selections based on zoning
Avaliability of land plot for project implementationYes
Land area, ha8
Land plot purposefor agriculture
Vacant space availiability for project implementation8 ha