For the construction and maintenance of a multifunctional facility
Rechitsa, intersection of Svetlogorskoye shosse and Chapaeva streets,
General characteristics
Lease
Decree № 10Yes
Total area, ha7.1
Potential ways of usageOther
Other ways of usagefor the construction and maintenance of a multifunctional facility
Sanitary zones or other restrictions-
Other significant facilities-
Cadastral value of 1 ha, $24700
Infrastructure
Highway, Main republican roads, Airport, Railway, Access road
HighwayM-10 (Russian border - Gomel - Kobrin)
7.5 (distance from the object, km)
Main republican roadsP-82 (Rechitsa-Parichi)
0.02 (distance from the object, km)
AirportGomel international airport
75 (distance from the object, km)
RailwayRechitsa railway station
1.5 (distance from the property, km)
Engineering communicationsElectricity, Drinking water, Gas supply
Engineering infrastructure descriptionFrom the existing 0.4 kV overhead line No. 1 (lighting network), it is necessary to build a 0.4 kV overhead line with a length of 200 m; power reserve - 20 kW; estimated cost - 12,000 rubles. ** The cost is approximate and is subject to clarification based on the results of the development of design and
Electricity supplyFrom the existing overhead 10 kV #2475 and overhead 10 kV #415, construction of overhead 10 kV to a new 50-meter-long transformer substation at the site; capacity reserve - 2 MW
0.15 (distance from the object, km)
Drinking water0.1 (distance from the object, km)
Gas supply0.15 (distance from the object, km)